Project facts
2 months
Duration of works
- Project owner
- JUMBO S.A.
- Location
- Corfu
- Project type
- Store car park extension
- Completed
- 2020
- Construction type
- Road base & retaining walls
- Scope
- Strip-out, earthworks, drainage & sewerage, walls, fencing, kerbs & road base
01 — The challenge
The JUMBO store in Corfu needed more parking. The new area had to be formed on the neighbouring part of the plot, at a different level from the road, and connected to the existing car park in front of the entrance. The works were completed in 2020, in two months.
02 — Our solution
We started with strip-out and the demolition of the old walls, followed by general excavation and fill to form the new levels. We built new walls and retaining walls along the plot boundaries, the fencing, the drainage and sewerage works and the road base. Kerbs were laid along every boundary and island, and the new area was linked to the existing car park by a ramp.
Photography
Construction stages
07 photos
Technical scope
8 trades,
one contractor
- 01Strip-out
- 02Wall demolition
- 03General excavation & fill
- 04Drainage & sewerage works
- 05New walls & retaining walls
- 06Fencing
- 07Kerbs
- 08Road base

The outcome
A new car park beside the JUMBO store in Corfu, completed in 2020 in two months and joined to the existing one, with more spaces for visitors.