Project facts
10,000 m²
Total area
- Project owner
- JUMBO S.A.
- Location
- Giannitsa, Pella
- Building type
- Retail store
- Construction type
- Steel superstructure
- Completion
- 2013
- Construction time
- 1 year
- Scope of work
- Full construction & site infrastructure
01 — The challenge
The site sat at the edge of town on farmland with no infrastructure at all — no access, no networks, no formed ground. Building the store was not enough: an entire facility had to be created from nothing to serve high retail footfall and daily truck deliveries.
02 — Our solution
We used a steel superstructure so fabrication could run in the factory while earthworks and foundations proceeded on site. The sales floor was designed with long clear spans and no intermediate columns, and the roof carries a dense grid of rooflights that materially reduces artificial lighting during trading hours. In parallel we built the new road access, parking areas, networks and street lighting.
Photography
The project
03 photos
Technical scope
9 trades,
one contractor
- 01Earthworks & excavation
- 02Reinforced concrete foundations
- 03Rooflights
- 04Industrial flooring
- 05Floor tiling
- 06Road access
- 07Asphalt paving & parking
- 08Stormwater & drainage networks
- 09Landscaping & external works

The outcome
The store was delivered within one year, fully operational and with the site complete — access, parking, networks and lighting. It is the earliest project in the portfolio we present here, and it stands in our home town of Giannitsa.