Project overview

ClientJUMBO A.E.
LocationTripoli, Arcadia
Building typeRetail store
LevelsTwo — ground & first floor
Total area9,700 m²
Construction typeConcrete & steel
EnvelopeSandwich panel system
Completion2015
Construction time9 months
Scope of workRenovation & extension

The challenge

This did not start on an empty plot. An existing building had to remain, and a new section had to rise beside it: levels, geometry and the way the two structures meet governed every decision that followed. The ground itself called for deep excavation and perimeter retaining walls before the first reinforcement went in.

Our solution

The structure combines both materials where each performs best: concrete for the two levels and the perimeter walls, steel for the part that had to go up fast. The envelope was closed with sandwich panels — insulation and finished surface in a single operation — and the elevation took on the client’s colour identity, with the curved corner and the ground-floor glazing defining the entrance.

Construction stages

01Excavation, retaining walls and foundations
02Columns, walls and ground-floor slab
03Covered entrance, planting and new road surface
04The curved end and the perimeter circulation
05Illuminated elevation and signage
06Extension, parking and road connection

Technical scope

Earthworks & excavation Retaining walls Reinforced concrete foundations Concrete superstructure Steel superstructure Sandwich-panel envelope Roofing & thermal insulation Entrance glazing Coloured facade panels & signage MEP installations Asphalt paving & parking Stormwater & drainage networks Road connection & markings Street lighting Landscaping

The result

The store now reads as one building: the existing section and the extension share the same elevation. We delivered its connection to the road network along with the building — the junction, parking, road markings, lighting and landscaping were all carried out by the same team, with no second contractor and no gap in responsibility between the building and the road.