Project facts
1,200 m²
Total area
- Project owner
- OCTOPUS PLAYGROUNDS
- Location
- Lagyna, Thessaloniki
- Building type
- Manufacturing facility
- Construction type
- Steel superstructure
- Completion
- 2026
- Construction time
- 7 months
- Scope of work
- Full construction
01 — The challenge
The brief called for a plant housing cutting, assembly, painting and storage of playground equipment under one roof, on a schedule tight enough for production to start within the same year.
02 — Our solution
We specified a steel superstructure, letting the frame be fabricated in the factory while earthworks and foundations proceeded on site. The layout was organised as a single clear-span hall so the production line can be rearranged, with a separate storage and loading zone.
Photography
Construction stages
06 photos
Technical scope
10 trades,
one contractor
- 01Earthworks & excavation
- 02Reinforced concrete foundations
- 03Steel superstructure
- 04Roofing & thermal insulation
- 05Industrial flooring
- 06Rooflights
- 07MEP installations
- 08Parking areas
- 09Stormwater networks
- 10External works

The outcome
The plant was handed over within seven months, ready for equipment installation, with industrial flooring, rooflights and landscaped surroundings.