Project facts
- Project owner
- MASOUTIS · JUMBO · AVEK VEKRAKOS
- Location
- Thessaloniki
- Building type
- Roadworks & intersection
- Construction type
- Road base & asphalt
- Completion
- 2026
- Scope of work
- Earthworks, asphalt, networks & signage
01 — The challenge
The existing road connection could not absorb the traffic generated by three major commercial facilities in the same area. Safe entry and exit for heavy vehicles was required without interrupting flow on the main axis, and the works had to be carried out with all stores fully trading.
02 — Our solution
We extended the traffic connection and built a new intersection with dedicated deceleration and acceleration lanes, so trucks merge without breaking the traffic flow. Works were phased, with temporary diversions that kept customer access open throughout.
Photography
Construction stages
11 photos
Technical scope
12 trades,
one contractor
- 01Earthworks & excavation
- 02Road base
- 03Asphalt layers
- 04Stormwater networks
- 05Manholes & gully gratings
- 06Kerbs & channels
- 07Pavements
- 08Road marking
- 09Vertical signage
- 10Parking areas
- 11Street lighting
- 12External works

The outcome
A new road connection was delivered with full asphalt paving, stormwater networks, horizontal and vertical signage, pavements and parking areas — measurably improving safety and heavy-vehicle access.
Next project — RoadworksJUMBO Car Park Extension — CorfuCorfu