Wastewater Treatment Plant — Chalkidona & Adendro

Projects/Public Works

Public Works

Wastewater Treatment Plant — Chalkidona & Adendro

Chalkidona & Adendro, Thessaloniki · 2018

Project overview

ClientJV THALIS E.S. – MESOGEIOS S.A.
Project ownerChalkidona Municipal Water & Sewerage Company
LocationChalkidona & Adendro, Thessaloniki
Project typeWastewater treatment plant
Capacity3,952 m³/day
Completion2018
FundingEU — ESPA / YMEPERAA
Our roleStructural works subcontractor
Rising mains400 m & twin 768 m
Village pumping stationsA4 · A6 · AK

The challenge

In a wastewater treatment plant, concrete is not judged on strength alone. The tanks have to stay watertight and withstand permanent contact with sewage, and their tolerances are set not by the contractor but by the equipment that will sit on them — a scraper bridge forgives nothing. The programme was not ours either: we worked as structural subcontractor inside the main contractor’s schedule, with the process and M&E crews waiting on each structure in turn.

Our solution

We organised the structural work by structure rather than by trade, so each tank was handed over complete and released immediately for its equipment. The circular tanks were reinforced and poured in continuous phases, the rectangular walls formed with steel formwork that gives a repeatable finish, and in parallel we built the service buildings, the village pumping stations and the rising mains — so the plant would not sit waiting for the network that feeds it.

Construction stages

01Base slab reinforcement of a circular tank
02Wall reinforcement of a circular tank
03Steel formwork for a rectangular tank wall
04Erection of the service buildings
05The plant from above during construction
06Pre-treatment tank and service building
07The scraper bridge on its bearing
08Settlement tank in operation
09The completed plant
10The plant in the Chalkidona plain

Technical scope

Earthworks & excavation Wastewater pre-treatment tank Circular reinforced concrete tanks Rectangular tanks & channels Watertight concrete for liquid-retaining structures Return & surplus sludge pumping station Sludge storage tank Equipment bases & starter bars Service buildings Village pumping stations A4 · A6 · AK 400 m rising mains Twin 768 m rising main Site services networks Internal roads & site works

The result

The plant has been in operation since 2018, serving Chalkidona and Adendro with a capacity of 3,952 m³ of wastewater per day. Alongside the plant we built the village pumping stations A4, A6 and AK and the rising mains — 400 metres plus a twin 768-metre main — that connect it to the network. The project was financed by the EU through the Greek Operational Programme for Transport Infrastructure, Environment and Sustainable Development.