Wastewater Treatment Plant — Chalkidona & Adendro
ProjectsPublic Works

Chalkidona & Adendro, Thessaloniki · 2018

Project facts

3,952 m³/day

Capacity

Main contractor
JV THALIS E.S. – MESOGEIOS S.A.
Project owner
Chalkidona Municipal Water & Sewerage Company
Location
Chalkidona & Adendro, Thessaloniki
Project type
Wastewater treatment plant
Completion
2018
Funding
EU — ESPA / YMEPERAA
Our role
Structural works subcontractor
Rising mains
400 m & twin 768 m
Village pumping stations
A4 · A6 · AK

01 — The challenge

In a wastewater treatment plant, concrete is not judged on strength alone. The tanks have to stay watertight and withstand permanent contact with sewage, and their tolerances are set not by the contractor but by the equipment that will sit on them — a scraper bridge forgives nothing. The programme was not ours either: we worked as structural subcontractor inside the main contractor’s schedule, with the process and M&E crews waiting on each structure in turn.

02 — Our solution

We organised the structural work by structure rather than by trade, so each tank was handed over complete and released immediately for its equipment. The circular tanks were reinforced and poured in continuous phases, the rectangular walls formed with steel formwork that gives a repeatable finish, and in parallel we built the service buildings, the village pumping stations and the rising mains — so the plant would not sit waiting for the network that feeds it.

Photography

Construction stages

10 photos

01Base slab reinforcement of a circular tank
02Wall reinforcement of a circular tank
03Steel formwork for a rectangular tank wall
04Erection of the service buildings
05The plant from above during construction
06Pre-treatment tank and service building
07The scraper bridge on its bearing
08Settlement tank in operation
09The completed plant
10The plant in the Chalkidona plain

Technical scope

14 trades,
one contractor

  1. 01Earthworks & excavation
  2. 02Wastewater pre-treatment tank
  3. 03Circular reinforced concrete tanks
  4. 04Rectangular tanks & channels
  5. 05Watertight concrete for liquid-retaining structures
  6. 06Return & surplus sludge pumping station
  7. 07Sludge storage tank
  8. 08Equipment bases & starter bars
  9. 09Service buildings
  10. 10Village pumping stations A4 · A6 · AK
  11. 11400 m rising mains
  12. 12Twin 768 m rising main
  13. 13Site services networks
  14. 14Internal roads & site works

The outcome

The plant has been in operation since 2018, serving Chalkidona and Adendro with a capacity of 3,952 m³ of wastewater per day. Alongside the plant we built the village pumping stations A4, A6 and AK and the rising mains — 400 metres plus a twin 768-metre main — that connect it to the network. The project was financed by the EU through the Greek Operational Programme for Transport Infrastructure, Environment and Sustainable Development.