Coffee Production Facility with Office Building

Projects/Production

Production

Coffee Production Facility with Office Building

Kavallari, Thessaloniki · 2026

Project overview

ClientFood & beverage manufacturer
LocationKavallari, Thessaloniki
Building typeProduction facility & office building
Total area10,000 m²
Construction typeReinforced concrete & steel structure
Completion2026
Construction time2 years
Scope of workFull turnkey construction

The challenge

The client needed a single facility housing coffee production, processing, packaging and distribution without those flows crossing each other. It also had to provide modern administrative offices, a generous yard for truck circulation, and headroom for future capacity expansion.

Our solution

We designed a single envelope that cleanly separates production from logistics, with long clear spans so machinery can be rearranged without structural work. The office building was integrated into the main elevation behind a glass curtain wall, loading ramps were placed on the opposite side for independent circulation, and the roof was engineered from the outset to carry a photovoltaic installation covering a substantial share of the facility's energy consumption.

Construction stages

01Earthworks & excavation
02Foundation preparation
03Precast column erection
04Structural frame complete
05Roof & envelope
06Landscaping & site development

Technical scope

Earthworks & excavation Reinforced concrete foundations Structural frame Roofing & thermal insulation Industrial flooring Glass curtain wall Office building MEP installations Fire protection system Loading ramps Photovoltaic installation Asphalt paving & parking Stormwater & drainage networks Landscaping & external works

The result

The facility was handed over fully operational — industrial flooring, MEP installations, fire protection, loading ramps, parking areas and landscaped surroundings. The rooftop photovoltaic installation feeds production, materially reducing the plant's reliance on the grid and its running costs. Remaining open land allows future expansion without interrupting production.