Project facts
11,500 m²
Total area
- Project owner
- AVEK VEKRAKOS S.A.
- Location
- Kavallari, Thessaloniki
- Industrial building
- 10,000 m²
- Office building
- 1,500 m²
- Construction type
- Reinforced concrete & steel structure
- Completion
- 2026
- Construction time
- 2 years
- Scope of work
- Full turnkey construction
01 — The challenge
The client needed a single facility housing coffee production, processing, packaging and distribution without those flows crossing each other. It also had to provide modern administrative offices, a generous yard for truck circulation, and headroom for future capacity expansion.
02 — Our solution
We designed a single 10,000 m² industrial envelope that cleanly separates production from logistics, with long clear spans so machinery can be rearranged without structural work. The 1,500 m² office building was integrated into the main elevation behind a glass curtain wall, loading ramps were placed on the opposite side for independent circulation, and the roof was engineered from the outset to carry a photovoltaic installation covering a substantial share of the facility's energy consumption.
Photography
Construction stages
11 photos
Technical scope
15 trades,
one contractor
- 01Earthworks & excavation
- 02Reinforced concrete foundations
- 03Structural frame
- 04Roofing & thermal insulation
- 05Industrial flooring
- 06Glass curtain wall
- 07Office building
- 08Food-grade hygienic panels
- 09Fire-rated roller shutters
- 10Loading ramps
- 11Photovoltaic installation
- 12Asphalt paving & parking
- 13Stormwater & drainage networks
- 14Perimeter boundary walls
- 15Landscaping & external works

The outcome
The 11,500 m² facility was handed over fully operational — industrial flooring, food-grade hygienic panels, fire-rated roller shutters, loading ramps, parking areas and landscaped surroundings.
The rooftop photovoltaic installation feeds production, materially reducing the plant's reliance on the grid and its running costs. Remaining open land allows future expansion without interrupting production.
What does a facility like this cost today? The 2026 cost guide→