A crane places beams on the precast concrete frame of the JUMBO store in Lesvos

6 min read · Published: 20 October 2026

By Achilleas Emmanouil Kechagias
CEO, Kechagias Construction · Planning and Regional Development Engineer

JUMBO store, Lesvos: beams and roof elements being placed on a precast concrete frame.

Choosing between a steel frame and precast concrete for a warehouse or industrial building in Greece depends on operational requirements, spans, fire protection, programme and total project cost. Both systems can provide suitable solutions when designed around the specific facility.

A meaningful comparison starts with the same brief: floor area, clear height, loads, envelope specification and handover condition. This guide explains the criteria investors should assess before selecting a structural system.

What exactly are we comparing?

A steel-framed building uses steel columns, beams or trusses manufactured off site and assembled on location.

A precast concrete structure uses reinforced or prestressed concrete elements produced in a factory, transported to the site and erected in position.

“Prefabricated” describes a production method rather than a particular material. Steel structures also use prefabricated components. In this guide, precast refers specifically to concrete construction.

Hybrid solutions are another option. For example, a building may combine concrete columns with a steel roof. The design process can therefore assess combinations of materials as well as individual systems.

Construction cost: compare the complete building

The frame accounts for only part of the investment. Meaningful comparisons require proposals based on the same dimensions, intended use, loads and performance requirements.

The budget should identify:

  • Earthworks, foundations and industrial floor slabs.
  • Frame manufacture, transport and erection.
  • Roofing, wall cladding, doors and weatherproofing.
  • Any required structural protection.
  • Mechanical and electrical services and fire protection.
  • Loading facilities, drainage, utilities and external works.

A lower quotation may include fewer items or different specifications. Ask each contractor to define the scope, exclusions and intended handover condition.

It is also helpful to separate confirmed requirements from optional provisions. Future office space, additional loading bays or allowances for new equipment should be described consistently in all proposals.

For a breakdown of the main budget considerations, read our warehouse construction cost guide for Greece.

Construction programme: consider the route to operation

For both systems, factory production can overlap with suitable site activities. However, completing the structural frame is only one milestone.

The overall programme depends on design completion, production availability, transport arrangements, erection planning and the sequence of following trades.

Site access deserves early attention. Delivery vehicles need suitable routes, cranes require working space, and components must arrive in the planned order.

Roofing, cladding, building services, utility connections and equipment installation may determine when the facility can start operating. A fast frame installation does not, by itself, establish the final completion date.

Request a programme covering the agreed handover stage, with clear milestones, responsibilities and assumptions.

Spans, clear height and operational layout

Column positions should support the building’s operation. In a warehouse, this means coordinating pallet racks, aisles and forklift movements. In a factory, the priorities may include production lines, maintenance access and material flows.

Before selecting the structure, establish:

  • Required clear height below beams and services.
  • Suitable column spacing.
  • Loading bay and large-door positions.
  • Crane, mezzanine and equipment requirements.
  • Anticipated changes in storage or production.

Different structural systems can provide large spans. Their suitability and economy depend on the geometry, loads and engineering design.

Investors should review usable space rather than floor area alone. Two buildings with the same footprint can accommodate different operating layouts because of their columns, internal clearances and service routes.

Fire protection: assess the complete building

Fire protection involves the structure, envelope, compartmentation, escape routes and any required protection systems.

Steel members may require protective coatings or other fire protection measures. For concrete elements, fire resistance depends on factors including member dimensions, reinforcement cover and construction details.

The required performance must be established for the specific building and its intended use. Material selection alone does not demonstrate compliance.

Fire protection should therefore be addressed during the comparison stage. Leaving it until after the structural choice can make the original quotations difficult to compare and introduce changes later in the project.

The design must also coordinate structural protection with doors, service penetrations and other interfaces.

Insulation and maintenance

Energy performance depends heavily on the roof, façades, openings, airtightness and building services.

Concrete’s thermal mass can contribute to a suitable environmental design, but it does not replace insulation. A steel-framed building also requires careful envelope detailing, including the treatment of thermal bridges.

Operational requirements matter. A general storage facility, temperature-controlled warehouse and manufacturing plant may need very different envelope and services specifications.

Maintenance planning should consider humidity, corrosive exposure, the activities inside the building and access for inspection. Coatings, joints, connections, seals and drainage require attention appropriate to the selected system.

Ask how these elements will be inspected and maintained once the facility is operating.

Steel and precast concrete: comparison at a glance

CriterionSteel framePrecast concrete frame
ProductionFactory fabrication and site assemblyFactory manufacture and site erection
Cost factorsMember sizes, connections, transport, lifting and protectionMember sizes, connections, transport, lifting and required detailing
Operational layoutDeveloped through project-specific designDeveloped through project-specific design
Fire resistanceAssessed with any required protectionDemonstrated through design and detailing
Future extensionRequires planned structural provisions and connectionsRequires planned structural provisions and connections
Selection basisTotal project cost, operation and programmeTotal project cost, operation and programme

Examples from Kechagias Construction projects

The JUMBO store in Katerini used a steel frame, while the JUMBO store in Lesvos used precast concrete construction. These projects illustrate the application of different structural systems in large commercial buildings.

They are not a direct cost or programme comparison, since their specifications and construction conditions differ. They demonstrate why structural selection should form part of the complete project design.

04 answers

Frequently asked questions

Which option is less expensive for a warehouse?

There is no universal answer. Comparable quotations must cover the same building, performance requirements and scope of works. Foundations, the envelope, services and external works should all be considered.

Which option can be delivered faster?

This depends on design readiness, manufacturing capacity, delivery logistics and the full construction sequence. Frame erection is only one part of the overall programme.

Can either building be extended later?

Yes, subject to appropriate design and site constraints. Future expansion should be considered from the outset, including structural provisions and available space.

Can steel and concrete be combined?

Yes. A hybrid structure may be suitable where the complete engineering assessment supports it.

Choose the system around your project

Kechagias Construction designs and builds industrial buildings and warehouses using steel and precast concrete systems.

We assess the intended use, site conditions and operational requirements so that the structural choice forms part of a coordinated building design.

Contact: info@kechagias.co · +30 23820 81511

Related pages

Next step

Planning a new warehouse or production facility in Greece?

Send us the location, approximate floor area and a brief description of your operation to discuss suitable options.